Saturday, June 18, 2011

lead abate a coat 600' stack in 28 days

Due to the success in coating the first two stacks, IA was contracted by the same customer to coat their third stack.  This stack was located directly next to the administration buildings and required a huge commitment to cover large sections of the plant, relocate and shuttle employees, and protect vital equipment including 500+ vehicles from dripping paint (due to height and wind speed painting via sprayer was not possible).  The 75,000+ sq ft was lead abated and painted in 28 days.

No comments:

Post a Comment